Tuapte Semper Ingredere Via

Community, People, Localization – a return to a human scale

Walls go up

leave a comment »

After a long winter wait the walls finally go up in early May.

South wall

South wall of the house.  The tubes sticking up in the foreground, wrap around to the west side and will be used to support the deck along those two sides.   Lots of space to sit and drink.

Water outside and inside was from the winter melt and recent rain falls.   Ground was saturated so it is draining off slowly.   Once the back filling is done (after another inspection) it will squeeze the water out a temporary trench towards the road which is a good 150 feet away.

Inside the walls

All to be backfilled with stone real soon.  Plumber next, soon I hope

Advertisements

Written by dcveale13

May 31, 2012 at 5:23 pm

Posted in Building, Cameron Veale

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: