Tuapte Semper Ingredere Via

Community, People, Localization – a return to a human scale

Back filling down, plumber to laid down pipe next

leave a comment »

Back filling is done.  Inspector dropped by to give his go ahead.   (seems to be inspections for everything)

Back filled on the south side

Too much gravel. have to get 4 inches out of there before i put down the insulation

Looking from the north side (back) south where the front of the house will be

Meeting the plumber tomorrow to connect up the well and lay down the plumbing infrastructure for the house.  For the kitchen, washing machine, bathroom and utility room.    Will see how that goes

 

Advertisements

Written by dcveale13

June 7, 2012 at 1:37 am

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: