Tuapte Semper Ingredere Via

Community, People, Localization – a return to a human scale

Plumbing roughed in

leave a comment »

Plumbers did the rough in on Thursday.    Pump put in the well and the line put in about 4 feet down below the frost line into the foundation.   Line goes into the house and up in the utility room which will house the pressure tank, water softener.

Intake from the well on the left and bathroom rough in at the back corner

Pipe then goes from the utility room off to the kitchen and bathroom.

Bathroom in the foreground and kitchen plumbing in the far corner

Finally got my cast off the right ankle last week.   Lot easier to get around but the darn thing is swollen still so doing exercises and trying to avoid twisting it when walking which is not easy at times around the property.  However a bit of pain is always good

Favouring the right leg but hobbling around. At least still standing after moving 10 loads of gravel

Advertisements

Written by dcveale13

June 9, 2012 at 10:04 pm

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: